Access to natural gas is a basic requirement for every household in Pakistan. Whether you have moved into a new home or are looking to upgrade your commercial facility, applying for a Sui Gas connection is now more easy than ever.
In Pakistan, two main companies provide gas services: SNGPL (Sui Northern Gas Pipelines Limited) for Punjab, KP, and AJK, and SSGC (Sui Southern Gas Company) for Sindh and Balochistan. This article covers the complete Sui Gas online application process, eligibility criteria, and tracking methods for 2026.

Which Company Should You Apply To?
Before starting your application, identify your service provider based on your location:
- SNGPL: If you live in Lahore, Islamabad, Rawalpindi, Peshawar, Multan, Faisalabad, or any area in Punjab or Khyber Pakhtunkhwa.
- SSGC: If you live in Karachi, Hyderabad, Quetta, Sukkur, or any area in Sindh or Balochistan.
Eligibility Criteria & Requirements
To ensure your application is not rejected, you must fulfill these requirements:
- Property Documents: Proof of ownership (Registry, Allotment Letter, or Fard) of the house or shop.
- CNIC: A valid Computerized National Identity Card of the owner.
- Neighbor’s Bill: A copy of a recent gas bill from your immediate neighbor (to identify the nearest gas pipeline).
- Map/Sketch: A rough sketch of the location where the meter is to be installed.
- No Dues: There should be no previous gas billing defaults on the property.
How to Apply for SNGPL Online (Punjab & KP)
The SNGPL portal is highly digitalized. Follow these steps for SNGPL New Connection:
Step 1: Visit the Official Website
Go to the SNGPL official website: www.sngpl.com.pk. Look for the “Consumer Services” tab and click on “New Connection.”
Step 2: Fill out the Online Form
You will be redirected to the Online Application Form. You need to enter:
- Connection Type: Domestic (Home) or Commercial (Business).
- Personal Info: Name, Father’s Name, and CNIC.
- Address: Detailed house number, street, and colony.
- Nearest Reference: Enter the 11-digit account number of your neighbor’s gas bill.

Step 3: Document Upload
Upload clear scanned copies of your CNIC and property ownership documents.
Step 4: Submission and Tracking
After submission, you will receive a Tracking ID via SMS. Save this ID to check your application status later.
How to Apply for SSGC Online (Sindh & Balochistan)
For residents of Karachi and other Southern areas, follow these steps for SSGC New Connection:
- Visit SSGC Portal: Go to www.ssgc.com.pk.
- Download/Fill Form: You can either fill out the web form or download the PDF application form.
- Customer ID: SSGC will assign you a temporary customer ID once you submit your initial request online.
- Physical Submission: Unlike SNGPL, SSGC often requires you to submit the hard copies of your documents at their nearest CFC (Customer Facilitation Center) after the online registration.
Sui Gas Connection Fees and Charges (2026)
The cost of a new Sui Gas connection varies depending on the distance from the main pipeline.
- Application Fee: Usually a small processing fee (approx. PKR 500-1000).
- Security Deposit: This is refundable and depends on the gas load. For a standard domestic 5-marla house, it ranges from PKR 6,000 to 10,000.
- Service Line Charges: If the gas pipeline is far from your house, additional charges per foot may apply.
Stages of Application
Once you apply, your application goes through several “Status” stages:
- Application Received: Your data is in the system.
- Survey Pending: A team will visit your home to verify the distance from the pipeline.
- Demand Notice Issued: You will receive a challan (bill) to pay the security and connection fees.
- Work Order Issued: After payment, a technical team is assigned to install the meter.
- Commissioned: The gas connection is active.
How to Track Sui Gas Application Status
You don’t need to visit the office to check progress.
- SNGPL Tracking: Go to the SNGPL website, click “Status of New Connection,” and enter your 11-digit Tracking ID or CNIC.
- SMS Tracking: Send your application number to 0921 (for SNGPL) to get an instant update via text.
Common Reasons for Application Rejection
To ensure you are on the first page of Google, it’s vital to help users avoid mistakes:
- Incorrect Neighbor Bill: Providing a bill of a neighbor who is on a different block.
- Incomplete Property Docs: Using a “Power of Attorney” that isn’t legally verified.
- Illegal Extensions: If the team finds you were using gas illegally (UFG) before applying, your application will be blocked and a heavy fine will be imposed.
Contact and Helpline Information
If you face any issues during the online process, use these official contact details:
- SNGPL Helpline: 1199
- SSGC Helpline: 1199
- Email: info@sngpl.com.pk / info@ssgc.com.pk
Applying for a Sui Gas new connection in 2026 is much faster if you use the online portals. By keeping your property documents and neighbor’s bill ready, you can complete the registration in under 15 minutes. Always remember to pay your Demand Notice only in authorized banks and never pay cash to any individual or agent.
Frequently Asked Questions (FAQs)
Q1. What is the total cost of a new Sui Gas connection in 2026?
For the 2026 cycle, the government has shifted new domestic connections to the RLNG (Regasified Liquefied Natural Gas) model. The estimated cost for a standard house (up to 10 Marla) is approximately PKR 21,500 to PKR 22,725. This includes:
- Refundable Security Deposit: PKR 20,000
- Service Line Charges: PKR 1,500
- Taxes/Duties: PKR 225 – PKR 1,000 (depending on the province).
Q2. Is there an “Urgent” or “Fast Track” category?
Yes. If you want to bypass the standard merit list, you can apply for a Fast Track connection by paying an additional urgent fee of PKR 25,000. This can significantly reduce the waiting time for the site survey and meter installation.
Q3. Can I apply for a regular “System Gas” connection instead of RLNG?
As of late 2026, the government has primarily lifted the ban on RLNG-based connections. While traditional “system gas” (indigenous gas) is cheaper, it is currently reserved for older pending applications. New applicants are generally moved to the RLNG tariff, which is approximately 70% higher than conventional rates.
Q4. What documents are mandatory for the online application? You must have clear scans (under 1MB) of: Valid CNIC (Front and Back). Property Ownership Proof (Registry, Allotment Letter, or Sale Deed).
- Neighbor’s Gas Bill (A copy of the most recent bill from your immediate neighbor).
- Affidavit (For certain categories, confirming no gas theft or previous dues).
Q5. How can I track my application status?
You can track your application status using your 14-digit Reference Number or CNIC on the official tracking portals:
- SNGPL Tracking: SNGPL Online Status
- SSGC Tracking: SSGC Customer Connect App or Web Portal.
Q6. My application was rejected for being “Non-Feasible.” What does this mean?
“Non-Feasible” usually means that there is no gas distribution pipeline currently running in front of your premises. If the nearest gas main is too far away, the company cannot provide a connection unless a new network is laid, which may require a collective application from the entire street.
Tips for Quick Approval
- Neighbor’s Bill Accuracy: Ensure the neighbor’s bill you provide is for a house on the same street and side as yours. This helps the surveyor find the correct pipeline connection point.
- Clear Documents: Blurred photos of property documents are the #1 reason for application delays. Use a scanning app for high-quality results.
- Check for Dues: If your house was previously rented and the former tenant left unpaid bills, you must clear those arrears before a new meter can be installed.


Gas meter Ghar online
Gas meter online Ghar
Yas lhaza mera metar Nahin he Lagwana chta hno gas meter lagwana chahta hun